Wire rod digging machine bored piling equipment have 7 founction for choose :digging ,ditching, etc.suitable for building fast into the hole in foundation engineering construction machinery.Its construction of high efficiency, is the electric power, communication, municipal, railway, highway, construction, petroleum, trees,This machine changes the usual‘‘one machine one usage" andavoids the waste of human, financial, and time resource. Themultifunction machine can be widely used in electric power and telecom,municipal engineering, planting trees, building-construction when you
need to dig holes, set poles, dig trenches, pay-off, bulldoze, winch, drag
or lift 3-6t objects. This machine is ideal equipment for individual and
construction units.
Applicable geology:
a variety of models, suitable for all kinds ofterrain. Loess layer, clay layer,gravel layer with pebbles, weathered rockand soil layer, frozen soil layer,construction waste back:fill layer, sandlayer, living garbage layer.
Applicable engineering:
electric power construction cement pole drilling,solar photovoltaic power generation solar panels stents drilling and thescrew piles driving, the construction pile driving, light pole hole drilling.
Model No. | WD-CE-01 | DESCRIPTION | Hole digger |
1/power: 1004type four wheel tractor(Four-wheel drive) | |||
2/The length of drill: 1-6meters(customer booked) | |||
3/Bit diameter: 300-1200mm(customer booked) | |||
4/Spiral drill hydraulic drive form: hydraulic hoist | |||
5/Standard bar pit time: 40 seconds (500mm in diameter x depth 3M) | |||
6/Function:digging ,lifting and Bulldozing. | |||
7/Net/Gross Weight: 6.68t/6.8t | |||
8/Package Dimension:full 20 feet container | |||
9/color:green and yellow | |||
10/Working principle: screw be pushed by power from hydraulic. |
Advantage
The machine adopts full hydraulic pressure drive forms, improve the workefficiency.The superposed structure to make sure that one worker can operate the machine well
1. multifuncational automatic
2. tractor drive
3.full hydraulic pressure
4.all-in-one machine of pay-off,poling&earth auger
Factory working
Wire rod digging machine bored piling equipment could be product well in 7 days, custoer can also come to factory see workers working, testing machine, far way customer, we can take photos of machine during product