Hydraulic Vibratory Pile Driver, Kobelco SK360 Pile hammer
WADE Machinery. V series high frequency excavator hydraulic piling machine is using
vibrating pile sinking to drive or extract piles. It is especially suitable for municipal, bridges,cofferdam, building foundation etc. such short pile projects.
Advantages
- Easy operation
- Flexible control
- Silence operation
- Easy maintenance
- Precision design
- Reliable performance
- Quick speed
- Save time
Features Description
1.Four wheel drive, easy and smart to operate
2.Large torque motor, with strong power
3.Joystick control, Easily operation
4.Optional different screw driving unit, which could meet a variety of customer needs in different screws.
5.Wide view cabin, which facilitate the operator to observe the working environment
6.Equipped with a inclinometer, to facilitate the operator’s adjustment;
7.Equipped with high-low speed gear shift, improve work efficiency;
8.Unique and new design based on the wheel loader, easy to operate and maintenance is simple and convenient
9.Optional electrical gear shift with combined joystick, and electronic inclinometer, which can meet customer’s different needs.
10.Widely applied in pile solar system, street lights, all kinds of awning etc.
Operating principle
1. V series high frequency hydraulic vibratory pile driver internally installed two eccentric shaft. It adopts hydraulic motor to drive and produce high-speed revolution and vertical vibration force. Through the damping rubber block to maintain a certain amplitude to cope with various types of soil and pile driving.
2.Exciting force is proportional to the eccentric shaft size and the vibration times square. BEIYI eccentric shafts are all made after a detailed calculation and test which can combine strong vibration force and material properties, not only can meet the needs of the work but also guarantee the mechanical reliability.
The construction principle
Vibrating pile hammer is using its high frequency vibration to vibrate pile body with high acceleration to pass the vertical vibration of mechanical produce to pile which leading to changes in the soil structure around the pile, strength decrease. Soil around the piles become liquefaction to reduce frictional resistance between side of the pile and the soil.
Then using the excavator down force, vibrating pile hammer and pile body weight to sink pile into the soil. When extracting piles, in the condition of vibration to pull out the pile by using excavator lift force.
Excitation force needed by pile driving machinery are comprehensive determined by site soil, soil condition, moisture content and type of pile, construction.
The efficient of vibration pile method is higher than other methods. It is mainly applied to steel sheet pile, steel pipe pile and long slender concrete precast pile within 8 meters.
This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines.
The performance specification table
Power rating | 50 KW |
Rated speed | 2400 r/min
|
Start the voltage | 24 V
|
Dimension | 4370 x 2010 x 4290 mm
|
Crawler plate width | 260 mm
|
Highest pole | 4370mm
|
Scope of operation parameters of borehole diameter | 400-800mm
|
|
|
Maximum drilling depth | 15m
|
Drill pipe rotation speed | 71 r/min
|
Hydraulic system of main pump model | CBG1 - F032/032
|
The main pump speed | 2000-2400L/min |
The main pump pressure | 20 Mpa |
The main valve flow | 100 L/min
|
Hydraulic tank volume | 200L
|
The performance parameters of gradability
| degrees 30 |
Maximum speed | 5 KM/h
|
Operation example
We will choose the most suitable rapid economic logistics for you or you can choose your trust logistics.
Q:What's the function of it?
It is a machine for pile hole drilling, it drill the ground screws into the earth, after that you can fix many upper ground constructions on the drilled screws.
What's the usage of it?
A: It was widely used in solar project, road lights or signals fixing, sunshade or pavilion constructions, etc.
What's the warranty and service?
Warranty is one year or 1000 working hours whichever comes first. During warranty period, we'll post the parts with express, normally takes 4~5 days to arrive. And also we will offer relative training or services to help the user better use it.
Zhengzhou WADE Excavator Parts Factory, we are excavator parts factory, have 15 years experience, and a capable R&D team. Our product range includes hydraulic pile breaker, pile driver, hydraulic hammer, ripper, earth auger, hydraulic pulverizer, etc. With ISO9001, SGS and CE certificates.